北京马驹桥绿色数据中心

发布时间:2015/05/13   所属分类:数据中心

北京马驹桥绿色数据中心总建筑面积15000平米,包含15个模块化机房,管理机架2903个,可服务于超过45,000台服务器;建设等级Uptime Tier3+、新国标A级,单机柜电力13~20A,于2015年8月投产。

The 15,000㎡ Beijing Majuqiao Data Center contains 15 modular rooms and 2,856 cabinets with electric power of 13~20A each rack, which can serve more than 45,000 servers. Its design level is Uptime Tier3+, equivalent to Grade A of the new national standard. Beijing Majuqiao Data Center has been put into operation since August, 2015.[查看详情]

常州钟楼数据中心

发布时间:2015/05/26   所属分类:数据中心

江苏常州钟楼绿色数据中心位于江苏省常州市钟楼开发区华东云计算基地内,总建筑面积9万余平方米,包含4栋数据中心、1栋综合楼等,10000个机柜。一期建设5万平方米,包含2栋数据中心楼、1栋综合楼;数据中心2号楼规划机柜3072个,于2016年12月投产。

The 90,000㎡ Jiangsu Changzhou Zhonglou Data Center is located in the Eastern China Cloud Computing Base, contains 4 data center buildings with 10,000 cabinets, an office building, etc. The 50,000㎡ 1st phase main construction contains 2 data center buildings and an office building, the DC 2# with 2,952 cabinets was put into operation in December, 2016.[查看详情]

广州观达路数据中心

发布时间:2016/09/19   所属分类:数据中心

广州观达路数据中心位于广州市黄埔区观达路20号,距广深高速萝岗出口约2公里,是云泰数通华南云计算数据中心集群的一期项目,为4层结构,共建设2764个机柜,2018年10月投产。

Guangzhou Guanda Data Center, the 1st phase project of South China Cloud Computing Data Center Cluster, is located in No. 20 Guanda Road, Huangpu District, Guanghzou, 2km from Luogang Exit of Guangzhou-Shenzhen Highway. With 4 storeys and 24,000m2 construction area , Guanda Data Center will provide 2,764 cabinets in total. [查看详情]

广州瑞和路数据中心

发布时间:2016/04/21   所属分类:数据中心

广州瑞和路数据中心位于广州市黄埔区科学城瑞和路39号,距广深高速火村出口约2公里,是云泰数通华南云计算数据中心集群的二期项目,规划建设一座七层数据中心,总建筑面积约20,000平米(单层面积约2888平方米),规划建设机柜2,500个,供电总容量30,000-38,000KVA。

Guangzhou Ruihe Data Center, the 2nd phase project of South China Cloud Computing Data Center Cluster, is located in No. 39 Ruihe Road, Guangzhou Development District, 2km from Huocun Exit of Guangzhou-Shenzhen Highway. UniCloud will constructed Ruihe Data Center as a 7-storey customized data center in the park. The 20,000m2 Ruihe Data Center will provide 2,500 cabinets and 30,000-38,000KVA power capacity in total. [查看详情]